1. Place the loop clamp (6) so that mounting holes are in alignment with switch box cover holes.
2. Drop terminal lug end of rope (9) with box wrench (4) through loop clamp (6) as shown in figure 4-11.
3. Install screw (8), two flat washers (3), one terminal lug (7), new lock washer (2) and nut (1) that
secures loop clamp (6) to switch box cover.
4 . Refer to paragraph 4-12 and perform steps 13 through 16 of Inspection.
This task covers: a. Removal
b. Installation
INITIAL SETUP
Materials/Parts
Tools
Rivets, Blind Head
Tool Kit, General Mechanic's
(item 1, appendix B)
Equipment Conditions
Drill, 1/4-inch
(item 2, appendix B)
Reference
Riveter, Blind Head
(item 5, appendix B)
Both generator sets shut down,
paragraph 2-5.3.1.
Trailer support devices are
lowered, paragraph 2-3.2.1.
|