Table 4-2. Cable Assembly W19.
From
To
Wire Color
L1
Black
P2-A
Red
L2
P2-B
L3
Blue
P2-C
LO
P2-N
White
P2-G1
Green
GND
P2-G2
Green
GND
P2-G3
Green
GND
P2-G4
Green
GND
INSTALLATION
1. Connect new W19 to J2 of the switch box on unit A.
2. Connect the four leads of the power cable to the generator set on unit B.
4-12 SWITCH BOX ASSEMBLY MAINTENANCE.
This task covers: a. Removal
c. Installation
b. Inspection
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanic's
Reference
(item 1, appendix B)
Trailer support devices are
Materials/Parts
lowered, paragraph 2-3.2.1.
Both generator sets are shut down,
Washers, Lock
REMOVAL
1. Remove four nuts (14, figure 4-10), flat washers (5), and screws (6) that secure switch box assembly.
2. Disconnect W1, W2, W3, and W4 from the generator set load terminals (9).