Click here to make tpub.com your Home Page

Page Title: 2 1/2 TON TRAILER FRONT PLAT FORM Maintenance.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-661-13&P
4-24 2 1/2 TON TRAILER FRONT PLAT FORM Maintenance.
This task covers: a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanic's
Reference
(item 1, appendix B)
Trailer support devices are
lowered, paragraph 2-3.2.1.
Materials/Parts
Nut, Self-locking
Washers, Lock
REMOVAL
1. When removing the front platform on unit A refer to paragraph 4-12 and remove switch box.
Remove two hex nuts (8, figure 4-23), flat washers (2), two lock washers (7), and two screws (1)
that secure the two switch box supports (3).
2. Remove fifteen self-locking nuts (9), thirty-six flat washers (6 and 10), and fifteen screws (5) that
secure the platform (4) to the trailer. Discard self-locking nuts.
3. Remove front platform.
NOTE
Three flat washers (10) are used under the platform on each side to shim the
platform.
INSTALLATION
Position new front platform (4) on the trailer over mounting holes.
1.
Install fifteen screws (5), thirty-six flat washers (6 and 10), and fifteen new self-locking nuts (9) to
2.
secure platform (4).
3. When replacing front platform for Unit A, refer to paragraph 4-12 and install switch box assembly.
Install two screws (1), new lock washers (7), four flat washers (2), and two nuts (8), that secure
switch box supports.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business