TM 9-6115-661-13&P
Install conductor bus (13) between terminals 2 and 5.
8.
Install tagged wires, screws (16) and washers (14) and lock washers (15) to terminals.
9.
10. Position control panel assembly (10) with gasket (17) on switch box cover (6) and align mounting
holes.
11. Install 8 new lock washers (3) flat washers (2) and screws (4).
12. Close switch box cover (1) and secure with clamping catch (5).
This task covers: a. Removal
c. Installation
b. Test
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanic's
Reference
(item 1, appendix B)
Multimeter AN/PSM-45
Both generator sets shut down,
(item 2, appendix B)
Solder gun (item 2, appendix B)
Trailer support devices are
lowered, paragraph 2-3.2.1.
Materials/Parts
Solder (item 4, appendix E)
Housing, Indicator Light
Washer, Lock
REMOVAL
1.
Release clamping catch (8, figure 4-14) and open control panel access cover.
2.
Remove 8 screws (11), flat washers (9), lock washers (10) and control panel assembly (12). Discard
lock washers.
NOTE
The switch box assembly has eight lamps. Replacement procedures are the
same for each indicator lamp.
Tag leads connected to each terminal (13) of indicator lamp housing to be replaced, and unsolder
3.
each lead.
4.
Remove and retain lens (1), O-ring (14) and lamp (2).
Remove mounting nut (6) and internal tooth lock washer (5).
5.
6.
Slide indicator housing (3) out of control panel assembly (12) and remove O-ring (4).
|