|
|
TM 9-6115-663-13&P
c. Installation
This task covers: a. Removal
b. Test
INITIAL SETUP
Equipment Conditions
Tools
Reference
Tool Kit, General Mechanic's
Both generator sets shut down,
(item 1, appendix B)
paragraph 2-5.3.1.
Multimeter AN/PSM-45
Trailer support devices are
(item 2, appendix B)
lowered, paragraph 2-3.2.1.
Solder gun (item 2, appendix B)
Materials/Parts
Solder (item 4, appendix E)
Washers, Lock
REMOVAL
1.
Release clamping catch (8, figure 4-13) and open control panel access cover (7).
2.
Remove 8 screws (11), flat washers (9), lock washers (10) and control panel assembly (12). Discard
lock washers.
NOTE
The switch box assembly has eight lamps. Replacement procedures are the
same for each indicator lamp.
Tag leads connected to each terminal (13) of indicator lamp housing to be replaced, and unsolder
3.
each lead.
4.
Remove and retain lens (1), O-ring (14) and lamp (2).
5.
Remove mounting nut (6) and internal tooth lock washer (5).
6.
Slide indicator housing (3) out of control panel assembly (12) and remove O-ring (4).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |