TM 9-6115-663-13&P
Insert fuel container adapter into external fuel source. Secure fuel container adapter by pressing
i.
down on strainer clamp (l).
Refer to TM 9-6115-645-10 for initial adjustments, checks and self test.
2-5.1 Generator Set Operating Procedures. Refer to TM 9-6115-645-10 for generator set operating
procedures.
2-5.2 Trailer Operating Procedures. Refer to TM 9-2330-205-14&P for trailer operating procedures.
2-5.3 Power Plant switch Box Operating Procedures. The power plant can be operated either in a
single generator set configuration or parallel operation of the generator sets. The following paragraphs
provide operating procedures for a single generator, generators in parallel, or transfer of the load from one
generator to another.
2-5.3.1 Operating a Single Generator Set.
WARNING
Do not operate equipment until it is properly grounded and all load termi-
nals are not shorted. Failure to observe this warning can result in severe
personal injury or death.
NOTE
Before operating generator sets, all connections must be made to the switch
box assembly.
Perform the Preventive Maintenance Checks and Services (PMCS) listed as "Before" in table 2-2.
a.
Release the clamping catch (8, figure 2-8) and open the control panel access cover (7).
b.
To start either generator set, rotate the MASTER switch to START position. Hold MASTER
c.
switch in START position until oil pressure reaches 25 psi (172 k PA), and voltage reaches the
appropriate required value.
Release MASTER switch to PRIME AND RUN position.
d.
Readjust VOLTAGE potentiometer to required voltage.
e.
Readjust FREQUENCY potentiometer to required frequency.
f.
Place AC CIRCUIT INTERRUPTER switch in the closed position.
g.
h.
Check switch box to make sure that STATUS light (1 or 4) is lit for the generator set just started.
i.
At the switch box set the ON/OFF switch (3 or 6) in the ON position (ON Line light should LIGHT).
Generator is now supplying power to the load.
|