Click here to make tpub.com your Home Page

Page Title: 1 TON TRAILER GENERATOR MOUNTING RAIL MAINTENANCE.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-661-13&P
REPAIR
Refer to appendix G and replace fuel drain assembly.
INSTALLATION
1. Position tube nipple (7) on the equipment.
2. Install the flat washer (5), retaining nut (6) and drain cock valve (4) then tighten.
3. Install drain cock valve (4) on tube nipple (7).
4. Install hose assembly (1) and tighten hose fittings (8).
5. Install hose fitting (3) and tube cap (2) on drain cock valve (4).
6. Close drain cock valve (4) and open valve (9).
5-14 1 TON TRAILER GENERATOR MOUNTING RAIL MAINTENANCE.
b. Installation
This task covers: a. Removal
INITIAL SETUP
Equipment Conditions
Tools
Reference
General Mechanic's Tool Kit
(item 1, appendix B)
Trailer handbrakes set, front support
leg/landing leg lowered, and rear leveling-
Materials/Parts
support jack lowered; paragraph 2-3.2.1.
Nuts, Self-Locking
Generator set removed, paragraph 5-6.
Accessory box removed, paragraph 4-19.
Front platform removed, paragraph 4-25.
REMOVAL
1. Remove ten self-locking nuts (5, Figure 5-17), twenty flat washers (3 and 4), and ten cap screws (2)
from each generator mounting rail (1).
2. Lift generator mounting rails (1) off trailer frame (6). Save generator mounting rails (1).
3. Remove two locknuts (7), four flat washers (8), two bolts (9), and bracket (10).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business