Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-661-13&P
INSTALLATION
1. Install bracket (10, figure 5-17), using two bolts (10), four flat washers (9), and two locknuts (7).
2. Place generator mounting rails (1) on trailer frame (6). Align mounting holes in generator mounting
rails (1) with mounting holes in trailer frame (6).
Figure 5-17. Generator Mounting Rails on 1 Ton Trailer.
3. Place a flat washer (3) on each often cap screws (2). Insert cap screws (2) through mounting holes
in generator mounting rails (1) and trailer frame (6).
4. Install a flat washer (4) and a new self-locking nut (5) on each of ten cap screws.
5-15 TRAILER MODIFICATIONS REPAIR (PU-800, PU-801, PU-802, AND AN/MJQ-39 ONLY).
Repair of the rear steps, fender, front steps and front platform is limited to bending, straightening, and
welding. Refer to TM 9-237 for repair procedures.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business