|
|
TM 9-6115-661-13&P
2. Connect lead asindicated onwiring diagram (FO-1).
3. Connect P3 (7) to J4 (8) and position the switch box cover (4) over the switch box assembly.
4. Install new lock washers (2), flat washers (3) and screws (1) that secure switch box cover (4).
This task covers: a. Inspection
c. Repair
b. Removal
d. Installation
INITIAL SETUP
Tools
Equipment Conditions
General Mechanic's Tool Kit
Reference
(item 1, appendix B)
Helicoil Insertion Tool (item 7, appendix B)
Both generator sets shut down,
para 2-5.3.1.
Materials/Parts
Washers, Lock
Insert, Screw Threaded
INSPECTION
Visually inspect for corrosion, damage, or for loose or missing hardware.
REMOVAL
1. Remove 21 machine screws (1, figure 5-13), flat washers (3), and lock washers (2) that secure the
switch box cover (4) to the switch box assembly.
CAUTION
The control panel connector P3 is connected to connector J4. Movement
of the switch box cover is limited. To prevent damage to control panel
wiring harness, use caution removing switch box cover. Failure to
observe this caution can result in equipment damage.
2. Carefully position switch box cover (4) in front of switch box.
3. Disconnect P3 (7) from J4 (8) and set switch box cover (4) out of the way.
4. Remove switch box cover (4).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |