|
|
TM 9-6115-661-13&P
c. Repair
This task covers: a. Removal
d. Installation
b. Inspection
INITIAL SETUP
Equipment Conditions
Tools
Reference
General Mechanic's Tool Kit
(item 1, appendix B)
Both generator sets shut down,
para 2-5.3.1.
Materials/Parts
Washers, Lock
REMOVAL
1. Remove 21 machine screws (1, figure 5-13), flat washers (3), and lock washers (2) that secure the
switch box cover (4) to the switch box assembly.
CAUTION
The control panel comector P3 is connected to connector J4. Movement
of the switch box cover is limited. To prevent damage to control panel
wiring harness, use caution removing switch box cover. Failure to
observe this caution can result in equipment damage.
2. Carefully slide switch box cover (4) off switch box and set in front of switch box assembly.
3. Disconnect P3 (7) from J4 (8) and set switch box cover (4) out of the way.
4. Refer to FO-1, then label each end of lead to be replaced.
5. Disconnect and remove lead.
INSPECTION
Visually inspect lead for loose, broken, or corroded connections.
REPAIR
Refer to appendix G and repair or manufacture lead.
INSTALLATION
1. Position new lead in place.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |