Click here to make tpub.com your Home Page

Page Title: INSPECTION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-661-13&P
CAUTION
The control panel connector P3 is connected to connector J4. Movement
of the switch box cover is limited. To prevent damage to control panel
wiring harness, use caution removing switch box cover. Failure to
observe this caution can result in equipment damage.
2.
Carefully position switch box cover (4) in front of switch box assembly.
3.
Disconnect P3 (7) from J4 (8) and set switch box cover (4) out of the way.
4.
Refer to figure FO-1, then label all leads and plugs at each end of the wiring harness to be replaced.
Disconnect all leads and plugs.
5.
6.
Remove wiring harness.
INSPECTION
Visually inspect wiring harness for damaged or frayed wires, and loose, broken, or corroded connections.
REPAIR
Refer to appendix G and repair or manufacture wiring harness.
INSTALLATION
1. Position the new wiring harness in place.
2. Connect the leads and plugs as indicated on the wiring diagram (FO-1).
3. Connect P3 (7) to J4 (8) and position the switch box cover (4) over the switch box assembly.
4. Install new lock washers (2), flat washer (3), on each machine screw (1) and secure switch box
cover (4).
5-25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business