TM 9-6115-661-13&P
(6) Perform following continuity checks. If any multimeter indication is not correct, replace contactor
Lead Placement
Multimeter Indication
Contactor Terminals
open circuit
32 and 33
21 and 22
11 and 12
A1 and A2
B1 and B2
C1 and C2
open circuit
A1 and B1
open circuit
B1 and C1
open circuit
C1 and A1
(7) Remove power from power supply and disconnect lines connected in steps a.(2) and a.(3).
b. Repeat steps a.(1) through (6) for contactor K2 (15, figure 5-11).
5. Reassemble switch box assembly as follows:
a. Refer to paragraphs 5-8 through 5-12 and repair or replace any defective parts.
b. Position the switch box cover (4, figure 5-11) in front of the switch box assembly.
c. Connect P3 (8) to J4 (11).
d. Position the switch box cover (4) over the switch box assembly and align the mounting holes.
e. Install lock washers (2), flat washers (3), and screws (4), that secure the switch box cover (4).
This task covers: a. Removal
b. Installation
b . Repair
INITIAL SETUP
Tools
Equipment Conditions
Reference
General Mechanic's Tool Kit
(item 1, appendix B)
Both generator sets shut down, para 2-5.3.1.
Trailer support devices are
Materials/Parts
lowered, paragraph 2-3.2.1.
Washers, Lock
REMOVAL
1. Release clamping catch (6, figure 5-13) and open the control panel access cover (5).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |