Click here to make tpub.com your Home Page

Page Title: SWITCH BOX LOAD TERMINAL MAINTENANCE.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-663-13&P
7. Install eight lock washers (10), flat washers (9), and screws (11) that secure control panel
assembly (12).
8. Install lens (1), O-ring (14), and lamp (2).
9. Close the control panel access cover (7) and secure with clamping catch (8).
4-17 SWITCH BOX LOAD TERMINAL MAINTENANCE.
c. Installation
This task covers: a. Removal
b. Repair
INITIAL SETUP
Equipment Conditions
Tools
Reference
Tool Kit, General Mechanic's
Both generator sets shut down,
(item 1, appendix B)
paragraph 2-5.3.1.
Trailer support devices are
Materials/Parts
lowered, paragraph 2-3.2.1.
Terminal, Load
Wire, Round Steel, 0.072 inch diameter
QQ-W-423 Composition 302
REMOVAL
1. Remove 21 screws (2, figure 4-14), lock washers (3), and flat washers (4).
2. Release clamping catch (5) and open load terminal door (1).
CAUTION
The control panel connector P3 is connected to connector J4. Movement of
the switch box cover is limited. To prevent damage to control panel wiring
harness, use caution removing switch box cover. Failure to observe this
caution can result in equipment damage.
3. Carefully position switch box cover (15) in front of switch box assembly.
4. Disconnect P3 (6) from J4 (7).
5. Remove switch box cover (15).
6. Disconnect external load terminal lead from the defective terminal (14).
NOTE
For removal of ground load terminal go to step 8.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business