TM 9-6115-661-13&P
NOTE
This PMCS table lists the checks and services as performed on a single Power
Unit. These procedures must be duplicated on each Power Unit that makes
up the AN/MJQ-39.
Unit B of the AN/MJQ-39, PU-800, PU-801, PU-801A, and PU-802 does not
have a switch box. Maintenance for the switch box is only applicable to Unit
A of the AN/MJQ-39.
Not Fully Mission
Item to be
Item
Procedure
No.
Interval
Capable if:
Checked or Serviced
WARNING
Before performing any maintenance that requires climbing on or under trailer, make
sure that trailer handbrakes are set, trailer front landing leg is lowered, and rear
leveling-support jack is lowered. Injury to personnel could result from trailer suddenly
rolling or tipping.
Inspect power cable for worn,
Power cable is
1
Semi
POWER CABLE
frayed or cracked insulation,
unserviceable.
annually
AN/MJQ-39
loose terminal lugs, and loose
connections. Tighten as needed.
2
Semi
SWITCH BOX ASSEMBLY
a. Inspect switch box assembly.
annually
AN/MJQ-39
Refer to paragraph 4-12.
b. Inspect mounting brackets for
cracks or loose or missing
hardware.
Mounting rail is
3
Semi
MOUNTING RAILS
Inspect for cracks and
cracked or deformed.
deformation.
annually
Semi
FIRE EXTINGUISHER
4
a. Inspect for broken seal and
annually
damage to handle.
Fire extinguisher not
b. Weigh to determine whether
charge is sufficient. Weight is charged.
about 13 pounds when fully
charged. If weight is 12.5
pounds or less, send to
specialized activity for
recharging.
Change 3
|