|
|
TM 9-6115-661-13&P
3-5 CONNECTING P1 TO UNIT A.
b. Installation
This task covers: a. Removal
INITIAL SETUP
Equipment Conditions
Reference
Both generator sets shut down, paragraph 2-5.3.1.
Trailer support devices are lowered, paragraph 2-3.2.1.
1. Open access panel (4, Figure 3-5) to unit A generator load terminals.
2. Connect P1 (6) to J16 (5) inside generator set.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |