Click here to make tpub.com your Home Page

Page Title: BUS BAR MAINTENANCE.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-663-13&P
INSPECTION
Visually inspect lead for loose, broken, or corroded connections.
Refer to appendix G and repair or manufacture lead.
INSTALLATION
1. Position new lead in place.
2. Connect lead as indicated on wiring diagram (FO-1).
3. Connect P3 (7) to J4 (8) and position the switch box cover (4) over the switch box assembly.
4. Install new lock washers (2), flat washers (3), and screws (1) that secure switch box cover (4).
5-11 BUS BAR MAINTENANCE.
Inspection
c.
Repair
This task covers:
Installation
d.
b.
Removal
INITIAL SETUP
Equipmment Conditions
Tools
Reference
Tool Kit, General Mechanic's
Both generator sets shut down, para 2-5.3.1.
(item 1, appendix B)
Helicoil Insertion Tool
(item 8, appendix B)
Materials/Parts
Washers, Lock
Insert, Screw Threaded
INSPECTION
Visually inspect for corrosion, damage, or for loose or missing hardware.
REMOVAL
1. Remove 21 machine screws (1, figure 6-13), flat washers (3), and lock washers (2) that secure the
switch box cover (4) to the switch box assembly.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business