Click here to make tpub.com your Home Page

Page Title: SWITCH BOX ASSEMBLY MAINTENANCE.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-663-13&P
9. Reconnect electrical leads (4) and P1 (3) to generator set when installing generator set on unit A.
5-7 SWITCH BOX ASSEMBLY MAINTENANCE.
b. Test
This task covers: a. Replacement
INITIAL SETUP
Equipment Conditions
Tools
Reference
Tool Kit, General Mechanic's
(item 1, appendix B)
Both generator sets shut down, para 2-5.3.1.
Multimeter, AN/PSM-45 (item 2, appendix B)
Trailer support devices are
lowered, paragraph 2-3.2.1.
Materials/Parts
Washers, Lock
REPLACEMENT
Refer to paragraph 4-12 to remove and install switch box assembly.
1. Disassemble switch box assembly for test as follows:
a. Remove 21 screws (1, figure 5-11), flat washers (3), and lock washers (2) that secure the switch box
cover (4) to the switch box assembly.
CAUTION
The control panel connector P3 is connected to connector J4. Movement of the switch box
cover is limited. To prevent damage to control panel wiring harness, use caution
removing switch box cover. Failure to observe this caution can result in equipment
damage.
b. Carefully position switch box cover (4) in front of switch box.
c. Disconnect P3 (8) from J4 (11) and set switch box cover (4) out of the way.
2. Remove two lamps for Unit A and two lamps for Unit B from switch box control panel.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business