Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-663-13&P
REPAIR
When the rope (9) requires replacement, perform the following
a. Cut old rope (9) from box wrench (4).
b. On new rope, flare each end to prevent unraveling.
c. Install new terminal lug (7) to one end of rope (9).
d. Thread other end of rope (9) through the opening in handle of load terminal wrench (4).
e. Install conductor splice (5) to secure rope (9) to the wrench (4).
INSTALLATION
1. Place the loop clamp (6) so that mounting holes are in alignment with switch box cover holes.
2. Drop terminal lug end of rope (9) with box wrench (4) through loop clamp (6) as shown in figure 4
10.
3. Install screw (8), two flat washers (3), one terminal lug (7), new lock washer (2), and nut (1) that
secures loop clamp (6) to switch box cover.
4. Refer to paragraph 412 and perform steps 13 through 16 of Inspection.
4-14 CLAMPING CATCH MAINTENANCE.
b. Installation
This task covers: a. Removal
INITIAL SETUP
Materials/Parts
Tools
Tool Kit, General Mechanic's
Rivets, Blind Head
(item 1, appendix B)
Equipment Conditions
Drill, 1/4-inch
(item 2, appendix B)
Reference
Riveter, Blind Head
Both generator sets shut down,
(item 5, appendix B)
paragraph 2-5.3.1.
Trailer support devices are
lowered, paragraph 2-3.2.1.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business