Click here to make tpub.com your Home Page

Page Title: Section Il. SERVICE UPON RECEIPT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-661-13&P
Section Il. SERVICE UPON RECEIPT
4-4 SERVICE UPON RECEIPT OF MATERIEL.
4-4.1 Unpacking Power Unit. (Refer to figure 4-1 and figure 4-2.) The power unit is boxed prior to
shipment. The PU-800, PU801, PU-801A, and PU-802 are identical with the exception of the electrical
output frequency of the generator sets. Two PU-800 Power Units are modified to make up the AN/MJQ-39
power plant. Therefore, the unpacking procedures and figures 4-1 and 4-2 are typical for each
configuration. Each generator set is packed in place on its respective trailer. Before beginning the
unpacking procedure, locate and remove Depreservation Guide.
a. Remove and set aside packing list from side of box. Also remove and set aside shortage packing list
if there is one.
Figure 4-1. Power Unit Packed for Shipment.