2-7 PREPARATION FOR MOVEMENT.
2-7.1 Shut Down Generator Set. Refer to paragraph 2-5.3.1 and stop both generator sets.
2-7.2 Disconnecting Load and/or Paralleling Cables.
WARNING
Never attempt to connect or disconnect load cables while the generator is
running. Failure to observe this warning could result in severe personal
injury or death by electrocution.
NOTE
Before connecting the load, determine voltage and frequency requirements
of the system or device that is being supplied with power. Refer to TM 9-
6115-643-10 and verify that voltage reconnection board is in proper position
for voltage requirements and the frequency select switch is in the proper
position. If board requires repositioning notify next higher level of mainte-
nance.
a. Disconnect power cable W19 from both generator sets.
b. Disconnect parallel cables from both units.
2-7.2.1 Power Unit. Refer to TM 9-6115-643-10 for removal of load cables.
2-7-2.2 Power Plant. Load may be connected to the switch box (figure 2-18) by either of two methods.
One method is to connect the load cable to the J1 connector (6). The other method is to connect load
cables to the load terminals (1, 2, 3, 4, and 5). Disconnect the load cable using the appropriate method.
Disconnect unit A from unit B as follows:
2-49