Click here to make tpub.com your Home Page

Page Title: Section 1. GENERAL INFORMATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-661-13&P
Section 1. GENERAL
1-1 SCOPE.
This manual is for your use in operating and maintaining the Power Unit PU-800, Power Unit PU-801,
Power Unit PU-801A, Power Unit PU-802, and Power Plant AN/MJQ-39 (figure 1-1 through figure 1-3).
The manual covers operating instructions and operator, unit and direct support maintenance requirements
for the equipment. It also contains a Repair Parts and Special Tools List (RPSTL) for the power units and
power plant. The Power Units PU-801, PU-801A and PU-802 are mobile units used to supply 15 kW of
50/60 Hz power. The PU-800 is a mobile unit used to supply 15 kW of 400 Hz power. Power plant
AN/MJQ-39 consists of two PU-800 Power Units, a switch box, and power cable.
1-2 MAINTENANCE FORMS AND RECORDS.
Department of the Army forms and procedures used for equipment maintenance will be those prescribed
by DA Pam 738-750 (The Army Maintenance Management System (TAMMS) Maintenance Management
UPDATE).
1-3 DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE.
Destruction of Army materiel to prevent enemy use shall be in accordance with TM 750-244-3.
1-4 PREPARATION FOR STORAGE AND SHIPMENT.
Refer to chapter 4, section VII for detailed instructions.
Figure 1-1. Curbside Front Three Quarter View.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business