|
|
TM 9-2320-391-10
M1079A1 VAN FIELD PHONE BINDING POST
OPERATION
INITIAL SETUP:
Maintenance Level
Operator
GENERAL
This work package provides the data and procedures for connecting field phone binding
posts and disconnecting field phone binding posts on the M1079A1 van.
CONNECTING FIELD PHONE BINDING POSTS.
1.
Connect positive wire to field PHONE POS binding post (1).
2.
Connect negative wire to field PHONE NEG binding post (2).
DISCONNECTING FIELD PHONE BINDING POSTS
1.
Disconnect negative wire from field PHONE NEG binding post (2).
2.
Disconnect positive wire from field PHONE POS binding post (1).
END OF WORK PACKAGE.
0034 00-1/2 Blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |