Click here to make tpub.com your Home Page

Page Title: M1079A1 VAN 24 VDC BINDING POST OPERATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-391-10
M1079A1 VAN 24 VDC BINDING POST OPERATION
INITIAL SETUP:
Maintenance Level
Operator
GENERAL
This work package provides the data and procedures for M1079A1 van 24 vdc binding post
operation. Items covered include Connecting The 24 VDC Binding Posts and Disconnecting
The 24 VDC Binding Post.
CONNECTING 24 VDC BINDING POSTS
1.
Connect positive wire to 24 vdc POS binding post (1).
2.
Connect negative wire to 24 vdc NEG binding post (2).
3.
Connect ground wire to 24 vdc GND binding post (3).
DISCONNECTING 24 VDC BINDING POSTS
1.
Disconnect ground wire from 24 vdc GND binding post (3).
2.
Disconnect negative wire from 24 vdc NEG binding post (2).
3.
Disconnect positive wire from 24 vdc POS binding post (1).
END OF WORK PACKAGE.
0033 00-1/2 Blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business