Page Title: RAISE AND LOWER LOAD - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2330-391-10
LIGHT MATERIAL HANDLING CRANE (LMHC)
0021 00
OPERATION - Continued
RAISE AND LOWER LOAD - Continued
WARNING
Ensure there are at least two wraps of cable on hoist drum at all
times. Cable could come off hoist drum while load is being lifted.
Failure to comply may result in injury to personnel or damage to
equipment.
CAUTION
If circuit breaker trips while Light Material Handling Crane (LMHC) is
operating, allow 30 minutes to cool down. If load is suspended, reset circuit
breaker and lower load. If circuit breaker trips again, notify Field
Maintenance. Failure to comply may result in damage to equipment.
Do not jerk hoist control causing load to bounce. Failure to comply may result
in damage to equipment.
4.
Position hoist control switch (33) to CABLE IN and take in cable (32) and lift load.
5.
Swing boom (11) to place load in desired location (WP 0021 00).
6.
Position hoist control switch (33) to CABLE DOWN and lower load.
7.
Remove hook (34) from load.
0021 00-24