TM 9-2330-391-10
LIGHT MATERIAL HANDLING CRANE (LMHC)
0021 00
OPERATION - Continued
RAISE AND LOWER LOAD
CAUTION
Do not lift load over maximum load rating for Light Material Handling Crane
(LMHC). Failure to comply may result in damage to equipment.
Use only a straight pull when lifting load. Failure to comply may result in
damage to equipment.
After performing eight cycles with LMHC, allow 30 minutes to cool down. A
cycle is defined as pickup, move, and place a load. A cycle may be from
cargo bed of vehicle to ground or ground to cargo bed of vehicle. Failure to
comply may result in damage to equipment.
NOTE
Steps 1 through 7 require the aid of an assistant.
1.
Adjust boom (11) until end of boom is over load (WP 0021 00).
2.
Position hoist control switch (33) to CABLE OUT and lower cable (32).
3.
Connect hook (34) to load.
0021 00-23
|