|
|
TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
FOR SPECIAL PURPOSE KITS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
PERSONNEL HEATER CONTROL BOX REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Applicable Models
Materials/Parts
All
Two lockwashers (item 242, WP 0470 00)
Tools and Special Tools
Equipment Condition
General mechanic's tool kit
Parking brake set and wheels chocked
(item 116, WP 0469 00)
(TM 9-2320-361-10).
Battery ground cable disconnected
(WP 0126 00).
NOTE
This procedure is the same for the engine coolant heater control box.
REMOVAL
1.
Disconnect wiring harness (4) from control box (7).
2.
Disconnect wire (6) from wire (5).
3.
Remove two nuts (2), lockwashers (1), and control box (7) from bracket (3). Discard lockwashers (1).
INSTALLATION
1.
Install control box (7) on bracket (3) with two new lockwashers (1) and nuts (2).
2.
Connect wire (6) to wire (5).
3.
Connect wiring harness (4) to control box (7).
4.
Connect battery ground cable (WP 0126 00).
5.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
4
2
3
1
5
7
6
END OF WORK PACKAGE
0352 00-1/2 blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |