|
|
TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
TRANSMISSION POWER TAKEOFF (PTO) SHIFT LINKAGE MAINTENANCE
REMOVAL, INSPECTION, ADJUSTMENT, AND INSTALLATION
INITIAL SETUP:
Applicable Models
Materials/Parts (Contd)
All
Locknut (item 147, WP 0470 00)
Screw-assembled lockwasher
Tools and Special Tools
(item 256, WP 0470 00)
General mechanic's tool kit
Equipment Condition
(item 116, WP 0469 00)
Parking brake set and wheels chocked
Materials/Parts
(TM 9-2320-361-10).
Battery ground cable disconnected
Cotter pin (item 28, WP 0470 00)
(WP 0126 00).
Two locknuts (item 145, WP 0470 00)
0347 00-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |