Click here to make tpub.com your Home Page

Page Title: BLOWER MOTOR RECEPTACLE REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
BLOWER MOTOR RECEPTACLE REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Applicable Models
Equipment Condition
M185A3, M109A3
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Materials/Parts
Battery ground cable disconnected
(WP 0126 00).
Two lockwashers (item 216, WP 0470 00)
NOTE
Prior to removal, tag all lead wires for installation.
REMOVAL
1.
Remove two screws (3) from blower motor receptacle (4) and van wall (1).
2.
Pull blower motor receptacle (4) forward and remove two screws (6), lockwashers (5), and wires (2)
from blower motor receptacle (4). Discard lockwashers (5).
INSTALLATION
1.
Install two wires (2) on blower motor receptacle (4) with two screws (6) and new lockwashers (5).
2.
Install blower motor receptacle (4) on van wall (1) with two screws (3).
3.
Connect battery ground cable (WP 0126 00).
4.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
1
2
~
6
5
3
4
END OF WORK PACKAGE
0338 00-1/2 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business