Click here to make tpub.com your Home Page

Page Title: EXHAUST BLOWER DUCT ASSEMBLY REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
EXHAUST BLOWER DUCT ASSEMBLY REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Applicable Models
Equipment Condition
M185A3, M109A3
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Battery ground cable disconnected
(WP 0126 00).
Exhaust blower motor and bracket removed
REMOVAL
1.
Remove four screws (1) and adapter (3) from duct assembly (2).
2.
Remove eight screws (5) and four angles (4) from van wall (7).
3.
Remove four screws (6) and duct assembly (2) from van wall (7).
INSTALLATION
1.
Install duct assembly (2) on van wall (7) with four screws (6).
2.
Install four angles (4) on van wall (7) with eight screws (5).
3.
Install adapter (3) on duct assembly (2) with four screws (1).
4.
Install exhaust blower motor and bracket (WP 0301 00).
5.
Connect battery ground cable (WP 0126 00).
6.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
3
2
1
7
4
6
5
4
END OF WORK PACKAGE
0337 00-1/2 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business