|
|
TM 9-2320-209-34-2-3
e.
Pressure Check.
FRAME
1
Soldier A
1.
Coat rubber seal (1) with sealing compound.
Soldiers
2.
Put upper part of container (2) on lower part of container.
A and B
Soldier A
3.
Put in 40 screws (3).
Soldier B
4.
Put on 40 lockwashers (4) and nuts (5).
5.
Using clean, dry air, pressurize container (2), through valve (6),
to 10 psi.
NOTE
Relief valve (7) should open between 7 to 10 psi.
6.
If relief valve (7) does not open, replace relief valve.
GO
TO
FRAME
2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |