Click here to make tpub.com your Home Page

Page Title: ENGINE SHIPPING AND STORAGE CONTAINER REPAIR - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-3
FRAME
2
Take out safety relief valve (1).
1.
2.
Put in air pressure gauge (2).
Using clean, dry air, pressurize container (3) to 10 psi.
3.
Apply soapy water to container (3).  Air bubbles or a drop in air
4.
pressure is a sign of air leak. To repair, refer to para 21-31c.
5.
Take out air pressure gauge (2).
6.
Put in safety relief valve (1).
END
OF
TASK
21-213/(21-214 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business