Click here to make tpub.com your Home Page

Page Title: POWERPLANT HEATER TEST - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-3
FRAME
6
Take off electrical lead (1) from fuel control valve body (2) and from
1.
pin A (3) of wiring harness connector (4).
2.
Take off electrical lead (5) from fuel control valve leads (6) and from pin B
(7) of wiring harness connector (4).
3.
Take off fuel supply line (8) from fuel inlet fitting (9).
NOTE
If these tests on fuel control valve were done as part
of cleaning, inspection, and repair, skip step 4, go to
para 21-6d (5), frame 2.
Put fuel control valve (2) on heater (10). Refer to para 21-6e, frame 8,
4.
frame 9, and frame 12.
END OF TASK
21-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business