Click here to make tpub.com your Home Page

Page Title: POWERPLANT HEATER TEST - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-3
FRAME
5
1.
Take restrictive electrical lead (1) out of clip (2).
2.
Hold fuel outlet (3) of fuel control valve (4) over overflow container (5).
3.
Be sure HI-LO switch (6) is in LO position.
Flip control switch (7) to RUN
position.  Fuel pump should be pumping.
4.
Let fuel flow into overflow container (5) for a
Flip HI-LO switch (6) to HI.
few seconds.
Let fuel flow into graduate (8) for exactly one minute. Flip HI-LO switch (6)
5.
to LO.  Flip control switch (7) to OFF position.
6.
Place graduate (8) on a level surface.  Read level of fuel (9) as shown. Level
of fuel should be as in table for type of fuel used.
FUEL TYPE
Diesel Fuel
Combat
DFA
DF1
DF2
Gasoline
Flow Rate
6.5 to 8.5
6.5 to 8.5
7 to 9
(cc/mm)
6 to 8
7.
If fuel flow is not within range of table, get a new fuel control valve (4).
GO TO FRAME 6
21-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business