|
|
TM 9-2320-209-34-2-3
(2) Testing set-up.
FRAME 1
1.
Mount heater assembly (1) on test stand (2).
2.
Connect coolant inlet hose (3) and outlet hose (4) to heater (1). Connect
exhaust pipe (5).
3.
Connect fuel supply line (6) to fuel inlet fitting (7).
4.
Connect wiring harness (8) to electrical connector (9).
GO TO FRAME 2
1
21-9
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |