|
|
TM 9-2320-209-34-2-3
FRAME 7
Put the original shim set (1) on wormshaft (2).
1.
Put key (3) on wormshaft (2) and slide sleeve (4) over key.
2.
Put on capscrew and washer (5).
3.
Turn wormshaft (2) to be sure inner bearing cone is properly seated against
4.
shoulder of wormshaft.
Slide sprocket (6) over sleeve (4).
Aline hole in sprocket with hole in
5.
sleeve.
Put pin (7) through sprocket (6) and sleeve (4).
6.
Put on two cotter pins (8).
7.
Put lubricating fitting (9) on sprocket (6).
8.
Put retaining ring (10) on sleeve (4).
9.
GO TO FRAME 8
18-119
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |