|
|
TM 9-2320-209-34-2-1
FRAME 6
1.
Take out 12 screws (1) and lockwashers (2).
Take off two retainers (3).
2.
NOTE
Keep shims (4) with retainer (3) from same side of carrier
case so that bearing preload will not be changed.
Take off shims (4).
3.
4.
Using micrometer, measure thickness of each pack of shims ( 4).
5.
If reading in frame 5 was more than limits given, use a thicker shim (4) or add
a shim.
6. If reading in frame 5 was less than limits given, use a thinner shim (4) or take
out a shim.
7. Take out through shaft assembly (5). Refer to para 10-7c, frame 10.
GO TO FRAME 7
10-74
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |