|
|
TM 9-2320-209-20-3-4
c. Replacement.
FRAME 1
1.
Put chain sling (1) around drum of winch (2) and join chain
sling to hoist.
Soldier A
2.
Guide winch (2) when soldier B lifts it off of ground onto truck.
3.
Soldier B
Using hoist, lift winch (2) off of ground into place on truck.
Soldier A
4.
Tell soldier B when mounting holes of winch (2) are alined.
5.
Using 3/4-inch wrench, screw in and tighten six screws (3)
with lockwashers (4) and flat washers (5).
6.
Do step 5 again on other side of winch (2).
7.
Unhook chain sling (1) from hoist and take it off drum on
winch (2).
NOTE
Follow-on Maintenance Action Required:
1.
Put front winch propeller shaft back in place. Refer
to para 19-5.
2.
Put cable back on front winch. Refer to para 19-10.
END OF TASK
TA
080867
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |