Click here to make tpub.com your Home Page

Page Title: Chapter 9. TRANSMISSION TRANSFER SYSTEM GROUP MAINTENANCE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-1
TRANSMISSION TRANSFER SYSTEM GROUP MAINTENANCE
Section I. SCOPE
9-1. EQUIPMENT ITEMS COVERED.  This chapter gives equipment maintenance pro-
cedures for the transmission transfer control and linkage assembly for which there
are authorized corrective maintenance tasks at the organizational maintenance level.
9-2. EQUIPMENT ITEMS NOT COVERED.  All equipment items for which corrective
maintenance is authorized at the organizational maintenance level are covered in this
chapter.
Section II.
TRANSMISSION
TRANSFER
CONTROL
AND
LINKAGE
ASSEMBLY
9-3. TRANSMISSION TRANSFER CONTROLS AND LINKAGE WITH POWER TAKEOFF
REMOVAL AND REPLACEMENT (TRUCKS M49A1C, M49A2C, M50A1, M50A2,
M50A3, M756A2, and M764).
NOTE
Procedures given are the same for both air actu-
ated positive lockup transmission transfer with
power takeoff, and non air actuated positive
lockup transmission transfer with power takeoff,
except where noted.
Vise grip pliers
3/4-inch socket wrench
TOOLS:
Small hammer
3/4-inch open end wrench
13/16-inch open end wrench
18-inch ruler
5/8-inch wrench
Needle nose pliers
Drift punch
SUPPLIES:
None
PERSONNEL:
TW O
Truck parked, engine off, handbrake set.
EQUIPMENT
CONDITION:
Preliminary Procedure.  Remove intermediate and rear tunnels. Refer to
a.
Part 3, para 18-5.
b.  Removal of Transmission Shift Lever and Linkage (Trucks M756A2 and M764).
Refer to para 9-4.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business