Click here to make tpub.com your Home Page

Page Title: CIRCUIT BREAKER REMOVAL AND REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-1
c. Replacement.
Put circuit breaker (1) on firewall (2) as shown and line up two mounting holes,
1.
2.
Put two screws (3) in mounting holes and tighten, using phillips screwdriver.
Plug connectors (4 and 5) into circuit breaker (1) as shown.
3.
NOTE
Trucks with auxiliary power outlets have an additional 15-
ampere circuit breaker.  This circuit breaker is located
next to circuit breaker (1).  Replacement procedures are
same for both breakers.
NOTE
Follow-on Maintenance Action Required:
1. Reconnect battery ground cable. Refer to para 7-58.
2.  Close hood and left side panel. Refer to
TM 9-2320-209-10.
END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business