TM 9-6115-663-13&P
Section Il. SERVICE UPON RECEIPT
4-4 SERVICE UPON RECEIPT OF MATERIEL.
4-4.1 Unpacking Power Unit. (Refer to figure 41 and figure 4-2.) The power unit is boxed prior to
shipment. The PU-805 and PU-806 are identical with the exception of the electrical output frequency of
the generator sets. Two PU-805 Power Units make up the AN/MJQ-41 power plant. Therefore, the
unpacking procedures are typical for each configuration. Each generator set is packed in place on its
respective trailer. Before beginning the unpacking procedure, locate and remove Depreservation Guide.
a. Remove and set aside packing list from side of box. ALSO remove and set aside shortage packing list
if there is one.
Figure- 4-1. Power Unit Packed for Shipment.