Click here to make tpub.com your Home Page

Page Title: Operation of Power Unit/Power Plant with Minor Leaks.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6115-661-13&P
2-2.6 Operation of Power Unit/Power Plant with Minor Leaks.
CAUTION
Equipment operation is allowable with minor leakage (Class I or II) of
any fluid except fuel. Fluid capacity must be considered before deciding
to continue operation of the equipment with minor leaks. When operating
with Class I or II leaks, fluid level must be checked more often than re-
quired by the PMCS table. Parts without fluid will stop working and/or
cause equipment damage.
a. Consider the equipment's capacity for the fluid that is leaking. If the capacity is small, the
fluid level may soon become too low for continued operation. If in doubt, notify your
supervisor.
b. Check the fluid level more often than required in the PMCS table. Add fluid as needed.
2-2.7 Corrosion Prevention and Control (CPC). CPC of Army material is of continuing concern. It is
important that any corrosion problems with the equipment be reported so that the problem can be
corrected and improvements can be made to prevent the problem in future items. While corrosion is
typically associated with rusting of metals, it can also include deterioration of other materials, such as
rubber and plastic. Unusual cracking, softening, swelling, or breaking of these materials may be a
corrosion problem. If a corrosion problem is identified, it can be reported using Standard Form 368,
Product Quality Deficiency Report. Use of key words such as "corrosion," "rust," "deterioration," or
"cracking" will ensure that the information is identified as a CPC problem. The form should be submitted
to the address specified in DA Pam 738-750.
2-2.8 Order in Which PMCS Will be Done. Figure 2-2 shows the order in which you are to perform
your PMCS. The figure shows a typical configuration having one generator set. Keep in mind that the
power plant consists of two PU-800 units and PMCS must be performed on each PU-800. The number
callouts on figure 2-2 correspond to the numbers in the Item No. column of table 2-2, for BEFORE PMCS.
2-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business