|
|
TM 9-2320-391-10
M1079A1 VAN AIR CONDITIONER/HEATER
OPERATION
INITIAL SETUP:
Maintenance Level
References
Operator
TM 5-4120-384-14
TM 5-4520-253-13
GENERAL
This work package provides the data and procedures for M1079A1 air conditioner and
heater operations.
AIR CONDITIONER OPERATION
1.
Open cover (1) on 110/208 VAC POWER DISTRIBUTION PANEL (2).
2.
Position main power switch (3) to ON.
3.
Refer to TM 5-4120-384-14, Operator's Organizational, Direct Support and General
Support Maintenance Manual.
HEATER OPERATION
1.
Open cover (1) on 110/208 VAC POWER DISTRIBUTION PANEL (2).
2.
Position main power switch (3) to ON.
3.
Refer to TM 5-4520-253-13, Operator's, Unit, and Intermediate Maintenance Manual.
END OF WORK PACKAGE.
0036 00-1/2 Blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |