|
|
TM 9 -2320-391-10
CARGO COVER KIT INSTALLATION/REMOVAL -
0024 00
Continued
SOFT TOP (STEEL BOWS) REMOVAL - Continued
69. Open stowage compartment door (1).
70. Stow five front tubes (2) and steel pole (3) in stowage compartment.
71. Close stowage compartment door (1).
WARNING
Cargo cover weighs approximately 60 lbs (27 kgs). Arctic cargo
cover weighs approximately 100 lbs (45 kgs). An assistant is
required to lift cargo cover. Failure to comply may result in injury to
personnel or damage to equipment.
NOTE
Step 72 requires the aid of an assistant.
72. Stow five rear tubes (19), four braces (20), left strap support (24), right strap
support (25), and cargo cover (22) on cargo bed (23).
0024 00-38
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |