|
|
TM 9 -2320-391-10
CARGO COVER KIT INSTALLATION/REMOVAL -
0024 00
Continued
SOFT TOP (STEEL BOWS) REMOVAL - Continued
NOTE
Left and right sides of front, center, and rear bows are secured the same
way. Right side shown.
65. Position three tiedown straps (4) on J-hook (14) with three tri-rings (15).
66. Tighten three tiedown straps (4).
67. Perform steps 65 and 66 on left side.
NOTE
Stowage strap should be positioned between center bow brackets and left
inside bow brackets.
68. Install stowage strap (16) on front bow (6), center bow (9), and rear bow (11).
0024 00-37
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |