|
|
TM 9-2320-391-10
M1078A1 SERIES GENERAL INFORMATION
0001 00
PREPARATION FOR SHIPMENT - Continued
Land, Sea, and Air Shipment
Instructions for shipment of the vehicle by land, sea, and air are contained in the following
publications:
PUBLICATION NUMBER PUBLICATION TITLE
MTMCTEA PAM 56-1
Marine Terminal Lifting Guidance
MTMCTEA PAM 55-19
Tiedown Handbook for Rail Movements
MTMCTEA Ref 92-55-20
Tiedown Handbook for Truck Movements
FM 55-450-3
Multiservice Helicopter External Air Transport: Basic
Operations and Equipment
FM 55-450-4
Multiservice Helicopter External Air Transport: Single-
Point Load Rigging Procedures
FM 55-450-5
Multiservice Helicopter External Air Transport: Dual-Point
Load Rigging Procedures
TB 55-46-1
Standard Characteristics (Dimensions, Weight, and
Cube) for Transportability of Military Vehicles and Other
Outsize/Overweight Equipment (in TOE Line Item
Number Sequence)
Preparation of Internal Air Transport Procedure
The Preparation for Internal Air Transport procedure for reducing cab height is contained
in WP 0048 00.
Tie Down and Helicopter-Lift
Vehicle Tie Down and Helicopter-Lift instructions are contained in Data and Instruction
Plates (WP 0036 00).
Preparation for Highway or Rail Shipment
Cab air springs must be deflated and pinned for shipment (WP 0048 00). Upon arrival at
destination, cab air springs must be unpinned and inflated (WP 0048 00).
0001 00-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |