Click here to make tpub.com your Home Page

Page Title: FUEL BURNING PERSONNEL HEATER TESTING - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
0435 00
FUEL BURNING PERSONNEL HEATER TESTING (Contd)
PREPARATION (Contd)
2.
Turn two fasteners (11) and remove guard (5) from heater (13).
3.
Disconnect lead (18) from 24-volt power source (20).
4.
Disconnect igniter lead (7) from ignition control unit (6).
5.
Remove nut-assembled lockwasher (1), shutoff valve lead (2), nut-assembled lockwasher (15) and
thermostat lead (14) from overheat switch (3). Discard nut-assembled lockwashers (1) and (15).
6.
Connect hose (10) to bleed screw (8) on fuel control valve (9) and place other end of hose (10) in
container (12).
7.
Connect lead (18) to 24-volt power source (20).
8.
Open fuel shutoff valves (17).
NOTE
Have drainage container ready to catch fuel.
9.
Place switch (23) in LO position. Place switch (21) in START position and hold. Open bleed
screw (8) and let fuel flow from bleed screw (8) until no air bubbles are observed in fuel.
10.
Place switch (21) in OFF position. Close bleed screw (8).
11.
Install thermostat lead (14) and shutoff valve lead (2) on overheat switch (3) with new
nut-assembled lockwasher (15) and (1).
12.
Connect igniter lead (7) on ignition control unit (6).
NOTE
Ignition time is the interval from activating control box switch
to START position until indicator lamp illuminates.
13.
Place switch (21) in START position and hold. Record time interval from activating switch (21)
until indicator lamp (22) illuminates. During this time interval, record ignition amperage on
meter (19). Place switch (21) in OFF position.
14.
If ignition time exceeds three minutes, or if ignition amperage exceeds 15 amperes, check fuel flow
and replace damaged parts (WP 0426 00WP 0435 00), as necessary.
FLAME DETECTOR SWITCH TEST
1.
Place switch (21) in START position.
2.
When indicator lamp (22) illuminates, place switch (21) in RUN position.
3.
If indicator lamp (22) does not light adjustor, replace flame detector switch (4) (WP 0431 00).
4.
Place switch (21) in OFF position.
FUEL CONTROL VALVE TESTING
1.
Place switch (21) in START position.
2.
When indicator lamp (22) illuminates, place switch (21) in RUN position.
3.
Check fuel consumption at flowmeter (16). Fuel consumption should be 10-13 cc/min at low heat,
and 19-24. cc/min at high heat. If fuel consumption rate is not within limits, replace fuel control
valve (9) (WP 0428 00).
4.
Check operating amperage at ammeter (19). If operating amperage exceeds 10 amperes, check
heater wiring and replace damaged parts (WP 0426 00WP 0435 00), as necessary.
5.
Place switch (21) in OFF position.
0435 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business