Click here to make tpub.com your Home Page

Page Title: PRIMARY AND SECONDARY HEATER EXHAUST TUBE REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
FOR SPECIAL PURPOSE KITS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
PRIMARY AND SECONDARY HEATER EXHAUST TUBE REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Applicable Models
Equipment Condition
M109A3, M185A3
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Materials/Parts
Battery ground cable disconnected
(WP 0126 00).
O-ring (item 122, WP 0470 00)
REMOVAL
WARNING
Do not touch hot exhaust system components with bare hands.
Severe injury to personnel will result.
1.
Remove two screws (4) and washers (2) from clamp (3) and van body (7).
2.
Remove nut (1), washer (2), screw (9), and clamp (3) from outside exhaust tube (5).
3.
Remove four screws (8), O-ring (6), and outside exhaust tube (5) from van body (7). Discard
O-ring (6).
INSTALLATION
1.
Install new O-ring (6) and outside exhaust tube (5) on van body (7) with four screws (8).
2.
Install clamp (3) on outside exhaust tube (5) with screw (9), washer (2), and nut (1).
3.
Install clamp (3) on van body (7) with two screws (4) and washers (2).
4.
Connect battery ground cable (WP 0126 00).
5.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
4
2
5
2
3
1
6
9
8
7
END OF WORK PACKAGE
0378 00-1/2 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business