TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
24-VOLT CIRCUIT BREAKER REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Applicable Models
Equipment Condition
M185A3, M109A3
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Materials/Parts
Battery ground cable disconnected
(WP 0126 00).
Two lockwashers (item 245, WP 0470 00)
REMOVAL
1.
Disconnect two wires (4) from circuit breaker (3).
2.
Remove two nuts (1), lockwashers (2), screws (5), and circuit breaker (3) from van body (6). Discard
lockwashers (2).
INSTALLATION
1.
Install circuit breaker (3) on van body (6) with two screws (5), new lockwashers (2), and nuts (1).
2.
Connect two wires (4) to circuit breaker (3).
3.
Connect battery ground cable (WP 0126 00).
4.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
1
2
3
4
~
5
6
END OF WORK PACKAGE
0324 00-1/2 blank
|