Click here to make tpub.com your Home Page

Page Title: TOOLBOX (UNDER CAB) REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
TOOLBOX (UNDER CAB) REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Applicable Models
Equipment Condition
All
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Materials/Parts
Battery ground cable disconnected
(WP 0126 00).
Eighteen locknuts (item 145, WP 0470 00)
Water can bracket and running board removed
REMOVAL
Remove eighteen locknuts (3), screws (4), and toolbox (1) from two supports (2). Discard locknuts (3).
INSTALLATION
1.
Install toolbox (1) on two supports (2) with eighteen screws (4) and new locknuts (3).
2.
Install water can bracket and running board (WP 0232 00).
3.
Connect battery ground cable (WP 0126 00).
4.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
2
1
2
3
4
END OF WORK PACKAGE
0226 00-1/2 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business