Click here to make tpub.com your Home Page

Page Title: FRAME ALIGNMENT INSPECTION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
FRAME ALIGNMENT INSPECTION
FRAME LEVELING, HORIZONTAL BOW INSPECTION, FRAME SQUARENESS, AND VERTICAL BOW INSPECTION
INITIAL SETUP:
Personnel Required
Applicable Models
Two
All
References
Tools and Special Tools
TB 9-2300-247-40
General mechanic's tool kit
(item 116, WP 0469 00)
Equipment Condition
Plumb bob (item 55, WP 0469 00)
Tape measure (item 106, WP 0469 00)
Parking brake set and wheels chocked
Two straight edges (item 105, WP 0469 00)
(TM 9-2320-361-10).
Hydraulic jack (item 47, WP 0469 00)
Set parking brake (TM 9-2320-361-10).
Jack stands
Vehicle undercarriage clean and free of mud
and debris (TM 9-2320-361-10).
Materials/Parts
Tires checked for proper air pressure
(TM 9-2320-361-10).
Chalk (item 11, WP 0468 00)
Battery ground cable disconnected
Tape, masking (item 44, WP 0468 00)
(WP 0126 00).
Tape, transparent (item 45, WP 0468 00)
Twine (item 47, WP 0468 00)
0206 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business